Wednesday, October 28, 2015

Timber joist delivery

Nearly 2 weeks there are no works been done.  only the timber joist delivery.









Friday, October 16, 2015

Bricklayer and subfloor started

Bricklayer has started early this week and expects to finish next week. after that, timber subfloor will be start.







RHS of the house, at the rear

left hand side of the house

view from the rear of the block



this is the outdoor room



Sunday, September 27, 2015

Home network for future reference.


Bathroom fittings and fixtures and Appliances.

Master ensuite 1760 free standing bath
Mizu Drift floor mounted water outlet for freestanding batg

LAUFEN Kartell round 420 basin for master ensuite

Milli Axon extended basin mixer (chrome) for master ensuites
Master ensuites toilet Fowler Seido icon series 2
Methven kiri exposure shower head and rail for master ensuite

Methven kiri basin mixer for powder room, ES2,3,4
Porcher Cygnet shower head and rail for powder room and ES 2,3,4,

Shower and Bath mixer for all rooms



 Powder room and ES 2,3,4 will have Ideal Standard Strada Rectangular basin undermount. I can't find the photo of it.
ROCA Meridian back to wall toilet for powder room, ES 2,3,4
Pantry's sink Clark Pete Evans 6610

Kitchen, Pantry and Laundry's sink mixers.


Clark Pete Evans double undermount kitchen sink
SMEG linear cooktop with glass

Blum Aventos HK for cupboard above the fridge.

Blum Aventos HS up and over for 3 overhead cupboards in kitchen and 2 in Pantry
SMEG CK2000-76 undermount rangehood

SMEG Oven SF304x

Microwave Smeg SA37x












Saturday, September 26, 2015

Stormwater drainage and pipes installed

Stormwater pipes have been installed after the strip footing is done.
Next thing will be the brickbase and supporting pillar.






Wednesday, September 23, 2015

One week after excavation,the strip footing is poured in one day. such a quick progress.

The neighbour complains about the timber fence at the rear is wobbling due to demolition and removing the root of the tree. We have to reassure them that we will fix the fence when we do our landscape and fence after the house is finished.

Site manager told me that the storm water drainage and brick pillar footing will be next.

Here are the photos of the strip footing.







Reinforcing steel inside the strip footing